Provided topographic surveying for the upgrade of the Runway 26L High Intensity Approach Lighting System with Sequenced Flashing Lights system and replacement of the Runway 8R localizer equipment shelter due to age and damage from Hurricane Harvey. The project required confined space entry into manholes and vaults and field survey conducted at night to maintain airport operations.