New Bayport Terminal Wharf 7

Provided topographic surveying and mapping for the design and construction of the new drilled shaft supported Wharf 7 at the Bayport Terminal. The landside surveying included Wharf 6 extending into the Bayport Ship Channel. The project included the Storm Water Quality Pond, off-site haul road route, West Empty Yard at Container Yard 7.