Topographic and right of way surveying; Topographic, right of way, parcel preparation, and control surveying along SL 195 in Starr County, Texas. In addition, we provided revisions to an existing survey for updates to the project site. This project involved the design of an 18 mile bypass from Roma to Rio Grande City to provide an alternate roadway to alleviate heavy truck traffic from the towns along the US 83 corridor. A large portion of this project was located along large properties that were primarily used for game ranches, Landtech expedited our survey operations to work around hunting seasons.